Monday, May 31, 2010

Matt- Final Model






I was able to take some outside photographs of my final model playing with sun and shadows.

Thursday, May 20, 2010

Sunday, May 16, 2010

Review Order

Unless somthing changes tomorrow, this is the order.

Pin-up at Noon in room 134. I'll be in around 11am.

Matt
Brian
Stacy
Dennis
Jenn
Nik
Steven
Derek

Friday, May 14, 2010

NO CLASS TOMORROW

Things look like they are shaping up. Keep working. No need to see me.

Thursday, May 13, 2010

Elevation FINALLY corrected


Here is the Western Elevation, added some shadows and I think it did alot as far as adding some depth. The drawing was way too flat previously. Let me know what you think. Tried to use the people to highlight the more public area's rather than labeling it....which i'm really trying to avoid doing.


Site Plan Revised


Final Changes that I made to the site before cutting my topo's. Theres a new retaining wall toward the south that follows the edge of the amphitheatre. It had to be created in order to accuratly make a connection between the surface above the gym and the area on the right. Took me a long time to fix all my topographical disasters i created. No more " -10, 0, 10, and 20. The real topo's are 2 , 12, 22, and 32. The water is 2 feet below land around the whole site.

Long Section

Wednesday, May 12, 2010

Nik - Elevation Adjusted

Just adjusted my elevation. I think its looking good. I got to adjust the plans accordingly now since this will change the overall layout of the top 2 floors for the theatre.

Final Crit Boards




















East and West Elevations


North and South Elevations



I still have to add the gray tone for the glass and the shadow for the glass that is set back.